Skip to main content

Public contracts of Montech · 2019 · Construction and buildings

Travaux d’eau potable : construction d’un réservoir

€683k
maximum contract amount over 2 years — what was paid on it is not published
Signed on 14 October 2019 · ended around October 2021 · 2 yrs

That is at most ~€341k a year on average: a maximum too.

Company selected

SaurCaptage, traitement et distribution d'eau · registered office Issy-Les-Moulineaux (92130) · headcount 5,000 to 9,999 employees · SIREN 339379984

A contract awarded to 2 holders; above, the main holder. With it: Touja. The amount is the whole contract’s: the DECP does not publish each holder’s share.

The largest of the 21 contracts Montech published for 2019.

Other contracts of Saur in Montech

Modification du système de prélèvement en Garonne2026 · maximum over 5 months839€kModification du système de prélèvement en Garonne2026 · maximum over 5 months839€kGénie civil et équipements des postes de refoulement2024 · maximum over 9 months334€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : 2

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.