Public contracts of Montech · 2019 · Construction and buildings
Travaux d’eau potable : construction d’un réservoir
That is at most ~€341k a year on average: a maximum too.
Company selected
SaurCaptage, traitement et distribution d'eau · registered office Issy-Les-Moulineaux (92130) · headcount 5,000 to 9,999 employees · SIREN 339379984A contract awarded to 2 holders; above, the main holder. With it: Touja. The amount is the whole contract’s: the DECP does not publish each holder’s share.
The largest of the 21 contracts Montech published for 2019.
Other contracts of Saur in Montech
Modification du système de prélèvement en Garonne2026 · maximum over 5 months839€kModification du système de prélèvement en Garonne2026 · maximum over 5 months839€kGénie civil et équipements des postes de refoulement2024 · maximum over 9 months334€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Ferme
Published amendments : 2
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.