Skip to main content

Public contracts of Montereau-Fault-Yonne · 2025 · Construction and buildings

Collégiale Notre-Dame-et-Saint-Loup, phase 1 : maçonnerie en pierre de taille

€1.2M
maximum contract amount over 3.5 years — what was paid on it is not published
Signed on 24 July 2025 · running until about November 2028 · 3.5 yrs
Ongoing23 Nov 2028

That is at most ~€366k a year on average: a maximum too.

Company selected

Soc Nouvelle le Bâtiment RégionalTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Sainte-Savine (10300) · headcount 20 to 49 employees · SIREN 400118188

The competition

10 bids received

Median for this procedure in 2025: 3 bids, across 49692 comparable contracts. Simplified procedure · awarded to 1 company

Open data gives the contract holder and the number of bids. The identity of unsuccessful bidders is not published.

Number 4 by amount of the 77 contracts Montereau-Fault-Yonne published for 2025. It belongs to the policy Culture, sport and youth.

Other contracts of Soc Nouvelle le Bâtiment Régional in Montereau-Fault-Yonne

Réalisation de travaux de remise en état après éboulement ponctuel des…2026 · maximum over 5 months89€kRéalisation de travaux de remise en état après éboulement ponctuel des…2026 · maximum over 17 months89€kMaçonnerie en pierre de taille, tranche ferme et tranches optionnelles2025 · maximum over 4.5 years1.2€M
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : none

Subcontracting declared : no

Environmental considerations : Clause environnementale

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.