Supplier of Montigny-le-Bretonneux · Construction and buildings
Mes
Mes holds one public contract awarded by Montigny-le-Bretonneux in 2019. That is 6% of the value of the contracts the town awarded in 2019.
head office in Ecully (69) · 10 to 19 employees · Travaux de menuiserie métallique et serrurerie · SIREN 442536975
€853k
at most, over the whole term of the contracts awarded by Montigny-le-Bretonneux in 2019
Its contracts in Montigny-le-Bretonneux
Maximum amount of each contract, over its whole term: not what was paid.
Construction d’un conservatoire de théâtre, musique et danse…2019 · maximum over 2 years · at most ~€426k a year on average · Open tender€853k