Skip to main content

Technicfer

Technicfer holds 14 public contracts awarded by Montpellier between 2020 and 2025. That is 1% of the value of the contracts the town awarded over the period.

head office in Montpellier (34) · 10 to 19 employees · Travaux de menuiserie métallique et serrurerie · SIREN 387651136

€353k
at most, over the whole term of the contracts awarded by Montpellier in 2025
maximum amounts set at signature, not what was paid · 19th of 557 suppliers of Montpellier from 2020 to 2025

Its contracts in Montpellier

Maximum amount of each contract, over its whole term: not what was paid.

Construction des extensions du groupe scolaire delteil michelet2025 · maximum over 17 months · at most ~€171k a year on average · Simplified procedure€242kConstruction du groupe scolaire croix d’argent de 17 classesRue colucci · Quartier croix d’argent · MTP · Serrurerie · 2025 · maximum over 2.5 years · at most ~€50k a year on average · Open tender€111kConstruction crèche Mireille LagetSerrurerie · 2024 · maximum over 18 months · at most ~€69k a year on average · Simplified procedure€103kSerrurerie2024 · maximum over 18 months · at most ~€69k a year on average · Simplified procedure€103kTravaux d’entretien dans les bâtiments communauxMétallerie · 2022 · maximum over 5 years · at most ~€2.3M a year on average · framework agreement: a maximum envelope, not spending · Open tender€10.9M
See the 9 other contractsTransformation du site du Conservatoire en école primaireMétallerie · Serrurerie · 2022 · maximum over 2 years · at most ~€102k a year on average · Open tender€220kMétallerie-serrurerie2022 · maximum over 2 years · at most ~€102k a year on average · Open tender€220kRestructuration du palais des sport Pierre de Coubertin à…Serrurerie · 2022 · maximum over 15 months · at most ~€110k a year on average€138kRestructuration palais des sports MTP2022 · maximum over 20 months · at most ~€83k a year on average · Simplified procedure€138kConstruction du restaurant du Groupe scolaire Armstrong-BonSerrurerie · 2022 · maximum over 15 months · at most ~€66k a year on average€82kConstruction du restaurant du groupe scolaire armstrong bonSerrurerie · 2022 · maximum over 15 months · at most ~€66k a year on average · Simplified procedure€82kÉquipements sportifs des écoles et sites sportifs : fourniture, pose…2020 · maximum over 4 years · at most ~€1.5M a year on average · Open tender€5.9MConstruction de l’école primaireZAC de la Restanque · Serrurerie · Metallerie · 2020 · maximum over 17 months · at most ~€372k a year on average · Open tender€527kConstruction de l’école primaire ZAC restanque/Serrurerie · Métallerie · 2020 · maximum over 23 months · at most ~€275k a year on average · Open tender€527k

Year by year

€€7M in 2020 · €€11.8M in 2022 (the highest) · €€353k in 2025

Click a year to see its amount.

Regions, départements, intercommunalities

Technicfer holds contracts awarded by 4 of these bodies, worth €13.1M.

See the 4 bodiesHéraultDépartement · 1 contract€12MCommunauté d'agglomération Sète Agglopôle MéditerranéeIntercommunality · 4 contracts€505kMontpellier Méditerranée MétropoleIntercommunality · 4 contracts€503kCommunauté de communes du Grand Pic Saint-LoupIntercommunality · 1 contract€44k

Elsewhere in France

Technicfer holds contracts in 14 towns, worth €28.6M at award.

See its 8 largest other townsNîmes2 contracts€4.6MLattes1 contract€2.4MLe Crès3 contracts€1.2MClapiers2 contracts€221kLunel1 contract€180kMauguio2 contracts€144kJuvignac1 contract€117kTeyran1 contract€87k
Next supplier of MontpellierFpi SARL20th of 557 suppliers of Montpellier from 2020 to 2025€19.3M

Source: Public procurement — DECP (data.gouv.fr) ↗