Public contracts of Montpellier · 2026 · Professional services

Maîtrise d’oeuvre pour la construction du groupe scolaire rimbaud sud mosson

€1.6M
maximum contract amount over 4.5 years — what was paid on it is not published
Signed on 13 March 2026 · running until about November 2030 · 4.5 yrs
Ongoing12 Nov 2030

That is at most ~€352k a year on average: a maximum too.

Company selected

Bureau d'Études Techniques BetsoIngénierie, études techniques · registered office Montpellier (34080) · headcount 10 to 19 employees · SIREN 315014944

A contract awarded to a consortium of 8 holders; above, the main holder. With it: Seiri, Terrell, Rouch Acoustique, Freddy Charrier Paysagiste DPLG, La Strada, Nas Architecture, Aceec. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 35 by amount of the 188 contracts Montpellier published for 2026.

Other contracts of Bureau d'Études Techniques Betso in Montpellier

Maîtrise d’oeuvre en ingénierie fluide groupe groupe scolaire croix…2025 · maximum over 2 years64€kMaîtrise d’oeuvre en ingénierie fluide dans le cadre de la réalisation…2025 · maximum over 2 years64€kMission d’ingénierie en courant faible et fort, photovoltaïque…2023 · maximum over 3 years76€k
Contract details (procedure, price, amendments, lots)

Procedure : Marché passé sans publicité ni mise en concurrence préalable

Price : Forfaitaire

Published amendments : 1

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.