Supplier of Montrond-les-Bains · Construction and buildings
Établissements Noally
Établissements Noally holds 2 public contracts awarded by Montrond-les-Bains between 2018 and 2025. That is 1% of the value of the contracts the town awarded over the period.
head office in Chazelles-Sur-Lyon (42) · 10 to 19 employees · Travaux d'installation électrique dans tous locaux · SIREN 410348569
Its contracts in Montrond-les-Bains
Maximum amount of each contract, over its whole term: not what was paid.
Aménagement espace social pôle enfance jeunesse2025 · maximum over 10 months · Simplified procedure€67kConstruction d’un pôle tennis à Montrond-les-Bains2018 · maximum over 8 months · Simplified procedure€73kYear by year
Regions, départements, intercommunalities
Établissements Noally holds contracts awarded by one of these bodies, worth €100k.
Elsewhere in France
Établissements Noally holds contracts in 15 towns, worth €2.1M at award.