Supplier of Montrond-les-Bains · Transport and vehicles
Stineo
Stineo holds 2 public contracts awarded by Montrond-les-Bains between 2025 and 2026. That is 2% of the value of the contracts the town awarded over the period.
head office in Saint Genest Lerpt (42) · 3 to 5 employees · Construction de routes et autoroutes · SIREN 793140310
€40k
at most, over the whole term of the contracts awarded by Montrond-les-Bains in 2025
Its contracts in Montrond-les-Bains
Maximum amount of each contract, over its whole term: not what was paid.
MABC signalisation verticale et marquage routier2026 · maximum over 12 months · framework agreement: a maximum envelope, not spending · Simplified procedure€30kMABC signalisation verticale et marquage routier2025 · maximum over 12 months · framework agreement: a maximum envelope, not spending · Simplified procedure€40kYear by year
2026€30 k
2025€40 k