Skip to main content

Public contracts of Montrond-les-Bains · 2021 · Construction and buildings

Réhabilitation et développement du Château

€74k
maximum contract amount over 8 months — what was paid on it is not published
Signed on 8 November 2021 · ended around July 2022 · 8 months

Who won it

Bo MetalTravaux de menuiserie métallique et serrurerie · registered office Veauche (42340) · headcount 6 to 9 employees · SIREN 521387233

Number 9 by amount of the 20 contracts Montrond-les-Bains published for 2021.

Other contracts of Bo Metal in Montrond-les-Bains

Réfection de la passerelle sur la rivière de la Coise2024 · maximum over 5 months9€kSerrurie2022 · maximum over 3 months11€kSerrurerie2021 · maximum over 10 months81€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.