Skip to main content

Public contracts of Moret-Loing-et-Orvanne · 2022 · Other

Maîtrise d’œuvre arhitectes pour construction équipement culturel et cultuel eglise veneux

€184k
maximum contract amount over 2.5 years — what was paid on it is not published
Signed on 14 September 2022 · ended around March 2025 · 2.5 yrs

That is at most ~€74k a year on average: a maximum too.

Who won it

Eco FluidesIngénierie, études techniques · registered office Rouen (76100) · headcount 3 to 5 employees · SIREN 503797755

A contract awarded to 4 holders; above, the main holder. With it: Reber SAS, Origine Structures. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 9 by amount of the 17 contracts Moret-Loing-et-Orvanne published for 2022. It belongs to the policy Culture, sport and youth.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : 4

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.