Skip to main content

Public contracts of Mourenx · 2024 · Construction and buildings

T bassin orage

€3.5M
maximum contract amount over 2 years — what was paid on it is not published
Signed on 25 January 2024 · ended around January 2026 · 2 yrs

That is at most ~€1.7M a year on average: a maximum too.

Company selected

Entreprise Deumier (Deumier TP)Travaux de terrassement courants et travaux préparatoires · registered office Labastide-Cezeracq (64170) · headcount 20 to 49 employees · SIREN 321008161

A contract awarded to 5 holders; above, the main holder. With it: Saur, LS Architectes Associes, Sogea Sud Ouest Hydraulique (Rene Laporte), SAS Etchart Construction. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 2 by amount of the 39 contracts Mourenx published for 2024.

Other contracts of Entreprise Deumier (Deumier TP) in Mourenx

Création d’un bassin d’orage de 4 000 m32024 · maximum over 10 months3.6€MBassin d’orage2024 · maximum over 10 months3.4€MCanalisation2024 · maximum over 11 months1.2€M
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Forfaitaire

Published amendments : none

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.