Supplier of Moustoir-Ac · Construction and buildings
Fouillen Didier Maconnerie
Fouillen Didier Maconnerie holds 2 public contracts awarded by Moustoir-Ac in 2023. That is 15% of the value of the contracts the town awarded in 2023.
head office in Plumelin (56) · 3 to 5 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 491301784
€125k
at most, over the whole term of the contracts awarded by Moustoir-Ac in 2023
Its contracts in Moustoir-Ac
Maximum amount of each contract, over its whole term: not what was paid.
Marché en procédure adaptée avec négociation éventuelle2023 · maximum over 2 years · at most ~€29k a year on average€63kVestiaires de footballMaçonnerie · 2023 · maximum over 2.5 years · at most ~€25k a year on average · Simplified procedure€63k