Skip to main content

Public contracts of Mtsamboro · 2020 · Construction and buildings

Réalisation du ponton de m tsahara

€57k
maximum contract amount over 12 months — what was paid on it is not published
Signed on 26 August 2020 · ended around August 2021 · 12 months

Company selected

Etude Technique GénéraleIngénierie, études techniques · registered office Dembeni (97660) · SIREN 024044232

Number 9 by amount of the 10 contracts Mtsamboro published for 2020.

Other contracts of Etude Technique Générale in Mtsamboro

Analyse du dossier, réunion avant démarrage2024 · maximum over 12 months69€kÉtudes du projet, mission2023 · maximum over 7 months140€kPré diagnostic, définition de stratégie2023 · maximum over 5 months112€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.