Supplier of Neung-sur-Beuvron · Construction and buildings
Entreprise Foucher-Fournier
Entreprise Foucher-Fournier holds one public contract awarded by Neung-sur-Beuvron in 2024. That is 11% of the value of the contracts the town awarded in 2024.
head office in Dhuizon (41) · 20 to 49 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 319473260
€105k
at most, over the whole term of the contracts awarded by Neung-sur-Beuvron in 2024
Its contracts in Neung-sur-Beuvron
Maximum amount of each contract, over its whole term: not what was paid.
Extension du gymnase La Salamandre2024 · maximum over 12 months · Simplified procedure€105k