Public contracts of Nîmes · 2025 · Construction and buildings

Construction d’une Ferme École (du

Gros œuvre · Maçonnerie Pierre)

€628k
maximum contract amount over 19 months — what was paid on it is not published
Signed on 21 March 2025 · ended around October 2026 · 19 months

That is at most ~€396k a year on average: a maximum too.

Company selected

Bargeton FilsTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Nimes (30000) · headcount 6 to 9 employees · SIREN 388097677

Number 69 by amount of the 335 contracts Nîmes published for 2025.

Other contracts of Bargeton Fils in Nîmes

Gros œuvre2025 · maximum over 19 months628€kGros oeuvre2023 · maximum over 11 months384€kGros oeuvre2023 · maximum over 10 months354€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.