Public contracts of Nîmes · 2023 · Construction and buildings
Gros-oeuvre
Reconstruction du groupe scolaire léo rousson · Des lots 3 et 8
That is at most ~€1.3M a year on average: a maximum too.
Who won it
RD ConstructionTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Beaumont-Les-Valence (26760) · headcount 20 to 49 employees · SIREN 844671495Number 16 by amount of the 425 contracts Nîmes published for 2023. It belongs to the policy Schools.
Other contracts of RD Construction in Nîmes
Gros-Œuvre2023 · maximum over 23 months2.4€MContract details (procedure, price, amendments, lots)
Procedure : Procedure concurrentielle avec negociation
Price : Révisable
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.