Installation et location d’une construction modulaire provisoire

École Jean Moulin élémentaire

€218k
maximum contract amount over 4 years — what was paid on it is not published
Signed on 30 July 2024 · running until about July 2028 · 4 yrs
Ongoing30 Jul 2028

That is at most ~€55k a year on average: a maximum too.

Company selected

CougnaudFabrication de structures métalliques et de parties de structures · registered office Mouilleron-Le-Captif (85000) · headcount 1,000 to 1,999 employees · SIREN 892298324

Number 141 by amount of the 374 contracts Nîmes published for 2024.

Other contracts of Cougnaud in Nîmes

Mediathèque Marc Bernard : Création d’un bâtiment provisoire…2025 · maximum over 9 months550€kInstallation et location d’une construction modulaire a l’école jean…2024 · maximum over 4 years218€kInstallation et location d’une construction modulaire provisoire a…2024 · maximum over 4 years218€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.