Skip to main content

Public contracts of Nîmes · 2022 · Construction and buildings

Maçonnerie Gros œuvre

Travaux d’amélioration du niveau de sécurité et conformité accessibilité de l’Hôtel de Ville · Chapitre 2

€362k
maximum contract amount over 12 months — what was paid on it is not published
Signed on 29 March 2022 · ended around March 2023 · 12 months

Who won it

Entreprise MicheluttiConstruction d'autres bâtiments · registered office Nimes (30000) · headcount 1 or 2 employees · SIREN 720200104

Number 108 by amount of the 392 contracts Nîmes published for 2022. It belongs to the policy Administration and shared services.

Other contracts of Entreprise Michelutti in Nîmes

Maçonnerie2024 · maximum over 9 months145€kMaçonnerie gros oeuvre2022 · maximum over 19 months381€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.