Supplier of Nœux-les-Mines · Construction and buildings · Energy
Verrier Énergie
Verrier Énergie holds 9 public contracts awarded by Nœux-les-Mines between 2019 and 2026. That is 5% of the value of the contracts the town awarded over the period.
head office in Ruitz (62) · 10 to 19 employees · Travaux d'installation électrique dans tous locaux · SIREN 817620180
Its contracts in Nœux-les-Mines
Maximum amount of each contract, over its whole term: not what was paid.
Extension et mise à jour de la vidéosurveillance2026 · maximum over 3 years · at most ~€103k a year on average · Simplified procedure€310kÉclairage public et maîtrise de l’énergie2024 · maximum over 3 years · at most ~€203k a year on average · Simplified procedure€610kÉclairage public et maîtrise de l’énergie2024 · maximum over 3 years · at most ~€200k a year on average · Simplified procedure€600kAlarme incendie et éclairage sécurité centre brassens2024 · maximum over 6 months · Simplified procedure€74kRéseaux divers2023 · maximum over 3 years · at most ~€90k a year on average · Simplified procedure€269kSee the 4 other contracts
Rénovation de l’éclairage public rues de Lens, Béthune, Calais…2020 · maximum over 3 months · Simplified procedure€33kCité de la Fosse n°32019 · maximum over 4 months · Simplified procedure€144kCité Charcot2019 · maximum over 4 months · Simplified procedure€32kStade Cosec2019 · maximum over 4 months · Simplified procedure€26kYear by year
€€203k in 2019 · €€1.3M in 2024 (the highest) · €€310k in 2026
Click a year to see its amount.
Elsewhere in France
Verrier Énergie holds contracts in 6 towns, worth €4M at award.