Public contracts of Olmeto · 2024 · Construction and buildings

Réhabilitation du site de baracci

Phase 2-gros oeuvre prestations similaires

€90k
maximum contract amount over 5 months — what was paid on it is not published
Signed on 22 April 2024 · ended around September 2024 · 5 months

Who won it

Leandri Roch BTPTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Propriano (20110) · headcount 50 to 99 employees · SIREN 450635503

Number 3 by amount of the 7 contracts Olmeto published for 2024.

Other contracts of Leandri Roch BTP in Olmeto

Réhabilitation du site de baracci2023 · maximum over 12 months73€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Unitaire

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.

Réhabilitation du site de baracci: up to €90k over 5 months, Olmeto 2024 · Qipu