Supplier of Orange · Construction and buildings
Chevalier Bâtiment
Chevalier Bâtiment holds 7 public contracts awarded by Orange between 2019 and 2026. That is 2% of the value of the contracts the town awarded over the period.
head office in Bollene (84) · 10 to 19 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 500184858
Its contracts in Orange
Maximum amount of each contract, over its whole term: not what was paid.
Ac Adap gros oeuvre maçonnerie2026 · maximum over 3 years · at most ~€98k a year on average · framework agreement: a maximum envelope, not spending · Simplified procedure€294kConstruction du groupe scolaire du Coudoulet2023 · maximum over 18 months · at most ~€475k a year on average · Open tender€713kClôtures2023 · maximum over 3 years · at most ~€0.033 a year on average · framework agreement: a maximum envelope, not spending · Simplified procedure€0.1Démolition de l’ancien cinéma le capitole boulevard daladierOrange · 2020 · maximum over 4 months · Simplified procedure€135kNuméro de la consultation : 2020-MPA-25 Demolition de l’Ancien CINEMA…Demolition · GROS oeuvre · 2020 · maximum over 4 months · Simplified procedure€135kRéhabilitation de deux logements impasse du Parlement2019 · maximum over 12 months · 2 lots · Simplified procedure€238kYear by year
€€238k in 2019 · €€713k in 2023 (the highest) · €€294k in 2026
Click a year to see its amount.
Regions, départements, intercommunalities
Chevalier Bâtiment holds contracts awarded by 2 of these bodies, worth €684k.
Elsewhere in France
Chevalier Bâtiment holds contracts in 8 towns, worth €3.4M at award.