Skip to main content

Public contracts of Orvault · 2019 · Construction and buildings

Construction d’un multi accueil au Bignon

€95k
maximum contract amount over 15 months — what was paid on it is not published
Signed on 26 July 2019 · ended around October 2020 · 15 months

That is at most ~€76k a year on average: a maximum too.

Company selected

Vendee Fluides ÉnergiesTravaux d'installation électrique dans tous locaux · registered office Dompierre-Sur-Yon (85170) · headcount 100 to 199 employees · SIREN 497549162

Number 14 by amount of the 44 contracts Orvault published for 2019.

Other contracts of Vendee Fluides Énergies in Orvault

Travaux de construction d’un multi-accueil sur le site du Bignon2019 · maximum over 15 months4€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.