Skip to main content

Public contracts of Orvault · 2019 · Construction and buildings

Construction d’une structure multi-accueil sur le site du Bignon

€48k
maximum contract amount over 15 months — what was paid on it is not published
Signed on 5 April 2019 · ended around July 2020 · 15 months

That is at most ~€39k a year on average: a maximum too.

Company selected

Body MenuiserieTravaux de menuiserie bois et PVC · registered office Bressuire (79300) · headcount 10 to 19 employees · SIREN 324552603

Number 28 by amount of the 44 contracts Orvault published for 2019. It belongs to the policy Health and social care.

Other contracts of Body Menuiserie in Orvault

Travaux d’extension et restructuration du groupe scolaire La Salentine2020 · maximum over 22 months167€kConstruction d’un multi accueil au Bignon2019 · maximum over 15 months47€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : 2

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.