Skip to main content

Public contracts of Oullins-Pierre-Bénite · 2020 · Construction and buildings

Restructuration du groupe scolaire de la Glacière

€394k
maximum contract amount over 2.5 years — what was paid on it is not published
Signed on 26 June 2020 · ended around September 2022 · 2.5 yrs

That is at most ~€175k a year on average: a maximum too.

Company selected

Climatisation Chauffage Sanitaire SifferTravaux d'installation d'eau et de gaz en tous locaux · registered office Brignais (69530) · SIREN 956510184

Number 10 by amount of the 71 contracts Oullins-Pierre-Bénite published for 2020. It belongs to the policy Schools.

Other contracts of Climatisation Chauffage Sanitaire Siffer in Oullins-Pierre-Bénite

Réfection partielle des vestiaires du stade du Merlo2020 · maximum over 3 months5€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.