Skip to main content

Public contracts of Perpignan · 2019 · Construction and buildings

Désamiantage et démolition des préfabriqués du groupe scolaire Vertefeuille

€38k
maximum contract amount over 2 months — what was paid on it is not published
Signed on 8 October 2019 · ended around December 2019 · 2 months

Company selected

Entreprise Sempere et FilsTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Pia (66380) · headcount 20 to 49 employees · SIREN 321263592

Number 108 by amount of the 186 contracts Perpignan published for 2019. It belongs to the policy Schools.

Other contracts of Entreprise Sempere et Fils in Perpignan

Restructuration de la crèche Hippolyte Despres (NPNRU)2026 · maximum over 3 years13€kTravaux de démolition du Mas St Joseph Avenue de la Salanque2025 · maximum over 12 months45€kTravaux démolition Mas Saint Joseph2025 · maximum over 12 months45€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.