Public contracts of Perpignan · 2025 · Construction and buildings
Restructuration de la crèche Hippolyte Despres (NPNRU)
That is at most ~€20k a year on average: a maximum too.
Company selected
SASU SNS ConstructionTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Toulouges (66350) · headcount 3 to 5 employees · SIREN 811753359A contract awarded to 3 holders; above, the main holder. With it: Ste d'Application Peintures-Etancheites Revetements (Saper), CLIMAX66 (IM2C Installation Maintenance Chauffage Climatisat). The amount is the whole contract’s: the DECP does not publish each holder’s share.
The competition
Median for this procedure in 2025: 3 bids, across 49692 comparable contracts. Simplified procedure · awarded to 3 companies
Open data gives the contract holder and the number of bids. The identity of unsuccessful bidders is not published.
Number 181 by amount of the 232 contracts Perpignan published for 2025. It belongs to the policy Health and social care.
Other contracts of SASU SNS Construction in Perpignan
Restructuration de la crèche Hippolyte Despres (NPNRU)2026 · maximum over 3 years60€kCrèche despres chape carrelage2026 · maximum over 3 years60€kAménagement de locaux modulaires2024 · maximum over 18 months54€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Forfaitaire
Published amendments : 2
Subcontracting declared : no
Social considerations : Clause sociale
Environmental considerations : Critère environnemental
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.