Supplier of Petit-Caux · Construction and buildings · Health and social care
K2F Construction
K2F Construction holds 9 public contracts awarded by Petit-Caux between 2022 and 2025. That is 7% of the value of the contracts the town awarded over the period.
head office in Petit-Caux (76) · 10 to 19 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 323601229
Its contracts in Petit-Caux
Maximum amount of each contract, over its whole term: not what was paid.
Entretien des bâtiments2025 · maximum over 4 years · at most ~€44k a year on average · 3 holders, whole-contract amount · Simplified procedure€175kTravaux Salles INT STQGros œuvre · 2025 · maximum over 8 months · Simplified procedure€143kEntretien des bâtiments2025 · maximum over 4 years · at most ~€22k a year on average · 3 holders, whole-contract amount · Simplified procedure€88kMulti-accueil : gros œuvre2024 · maximum over 18 months · at most ~€417k a year on average · Simplified procedure€625kRéhabilitation du groupe scolaire Saint-Martin : curage, gros œuvre…2023 · maximum over 2.5 years · at most ~€321k a year on average · Simplified procedure€748kSee the 4 other contracts
Construction d’une cantine périscolaire : gros œuvre2023 · maximum over 15 months · at most ~€580k a year on average · Simplified procedure€725kConstruction d’une MAM et de 6 logements locatifs2023 · maximum over 20 months · at most ~€278k a year on average · Simplified procedure€463kExtension et restructuration de la salle polyvalente de Tocqueville…2023 · maximum over 15 months · at most ~€115k a year on average · Simplified procedure€144kDéconstruction2022 · maximum over 14 months · at most ~€95k a year on average · Simplified procedure€110kYear by year
€€110k in 2022 · €€2.1M in 2023 (the highest) · €€405k in 2025
Click a year to see its amount.