Skip to main content

Public contracts of Petit-Caux · 2023 · Construction and buildings

Maîtrise d’œuvre pour le projet de maison de santé

€775k
maximum contract amount over 3 years — what was paid on it is not published
Signed on 29 December 2023 · running until about December 2026 · 3 yrs
Ongoing29 Dec 2026

That is at most ~€258k a year on average: a maximum too.

Company selected

Arc en SiteIngénierie, études techniques · registered office Eu (76260) · headcount 6 to 9 employees · SIREN 408605913

A contract awarded to 7 holders; above, the main holder. With it: En Act - Architecture, V3D Concept, Bureau d'Études E.S.G.C.B., Concept NF, SARL Agiracoustique France. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 5 by amount of the 74 contracts Petit-Caux published for 2023.

Other contracts of Arc en Site in Petit-Caux

Réhabilitation des écoles de Saint-Martin2021 · maximum over 12 months399€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : 1

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.