Skip to main content

Public contracts of Petit-Caux · 2023 · Construction and buildings

Restructuration Atelier communal Tourville

€47k
maximum contract amount over 12 months — what was paid on it is not published
Signed on 3 July 2023 · ended around July 2024 · 12 months

Company selected

Technic ConsultIngénierie, études techniques · registered office Bois-Guillaume (76230) · headcount 6 to 9 employees · SIREN 408131456

A contract awarded to 4 holders; above, the main holder. With it: Cabinet Eudois d'Études Economiques de la Construction, Esquina, Bureau d'Études E.S.G.C.B.. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 71 by amount of the 74 contracts Petit-Caux published for 2023.

Other contracts of Technic Consult in Petit-Caux

Maîtrise d’œuvre pour la réhabilitation de l’EHPAD2024 · maximum over 12 months320€kReconstruction du Ludimarché, partie 2 : maîtrise d’œuvre2024 · maximum over 12 months258€kAssistance à maîtrise d’ouvrage2022 · maximum over 13 months225€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.