Skip to main content

Public contracts of Pibrac · 2020 · Construction and buildings

Construction d’une école élémentaire et extension de la restauration scolaire à Pibrac

€78k
maximum contract amount over 20 months — what was paid on it is not published
Signed on 23 September 2020 · ended around May 2022 · 20 months

That is at most ~€47k a year on average: a maximum too.

Company selected

Caussat Espaces VertsServices d'aménagement paysager · registered office Daux (31700) · headcount 20 to 49 employees · SIREN 300197332

Number 18 by amount of the 23 contracts Pibrac published for 2020. It belongs to the policy Schools.

Other contracts of Caussat Espaces Verts in Pibrac

Services pour l’entretien des espaces verts de la Ville de Pibrac2021 · maximum over 2.5 years20€kEntretien des espaces verts2020 · maximum over 2.5 years194€kConstruction d’école élémentaire Maurice Fonvieille2020 · maximum over 2 years78€k
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.