Communauté d'agglomération Terre de Provence · Bouches-du-Rhône · Provence-Alpes-Côte d'Azur · 3,613 residents · Mayor: Jérôme Guichard
Plan-d'Orgon
€6.9 million spent in 2025.
€1,897 per resident · Towns of the same size: €1,360
Plan-d'Orgon’s spending by policy area
Click a line to see what it pays for
The 2 other items (1%)
Source: the town’s 2025 accounts (DGFiP), by public policy.
Where the money goes
The €6.9M spent in 2025, by who receives it.
Source: the town’s 2025 accounts (DGFiP).
Contracts state a maximum amount for their whole term, often several years. That amount differs from what was paid. Purchases, services and works paid to companies by the town in 2025: €3.6M (its accounts).
Click a name to see its contracts
- Assistance Technique Realisation1 contract over 12 months · at most ~€968k a year on averageup to €968k
- Sud Construction1 contract over 12 months · at most ~€700k a year on averageup to €700k
- Sam Énergie Renouvelable1 contract over 5 monthsup to €327k
- Bureau d'Études Techniques Betso1 contract over 12 months · at most ~€278k a year on average · contract with other holdersup to €278k
- Giorgi1 contract over 2 years · at most ~€125k a year on average · framework agreement: maximum envelopeup to €250k
- KP 21 contract over 12 monthsup to €212k
- Société Meridionale d'Application Électrique1 contract over 12 months · at most ~€198k a year on average · contract with other holdersup to €198k
19 published contracts · €4.2M before tax
Why this total differs from the €3.6M of purchases, services and works paid to companies
These are the amounts of the contracts signed from 2021 to 2025, over their whole length, not what was paid in 2025. The money paid in 2025 also goes to purchases too small to be published (under €40,000 excl. VAT). For a framework agreement, the amount is a ceiling.
Investment and works
€2.2M of capital spending in 2025 (building, renovation, equipment), €616 per resident. Towns of the same size: €358.
Click a building site to see the contract
- Construction Uffren2025 · 7 contracts€2.3M
- Création du réfectoire de la crèche : gros œuvre2024 · Health and social care · KP 2€212k
- Extension du bar des arènes2024 · 2 contracts€174k
- Réaménagement et extension des services techniques2025 · Administration and shared services · Alpilles Construction Renovation (El Farissi)€110k
- Réfection de voirie lotissement chantegrive2023 · Streets and transport · Colas France (Établissement Sorgues)€85k
Largest works contracted since 2023, among published contracts. Amounts planned at signature, often spread over several years.
In addition, €25k given to other bodies for their own equipment (joint funding, energy syndicate…).
Source: the town’s 2025 accounts (DGFiP), by public policy.
Revenue and financing
Revenue: €6.2M · borrowing: €2k · spending: €6.9M.
Source: the town’s 2025 accounts (DGFiP).
Debt and taxation
Accounts 2025, main budget (excluding annex budgets such as water), except debt and savings: main and annex budgets together (OFGL consolidated accounts). Per resident: amount divided by the total population (Insee, in force in the year of the accounts). Sources: DGFiP, OFGL. “Towns of the same size”: median of the 1,021 towns of 3,500 to 5,000 inhabitants.
Who spends for the residents of Plan-d'Orgon
Spending per resident in 2025 of each public body the town belongs to, and what each one pays for.
- TownPlan-d'OrgonPrimary schools, canteens, local streets, civil registry€1,897 per resident
- IntercommunalityCommunauté d'agglomération Terre de ProvenceWaste, water, urban transport, economic development€479 per resident
- DépartementBouches-du-RhôneMinimum income, elderly and disability care, middle schools, county roads€1,463 per resident
- RegionProvence-Alpes-Côte d'AzurHigh schools, regional trains, training, business support€558 per resident
Each amount is what the body spends per resident, from its accounts (DGFiP). Do not add them up: part of the money passes from one body to another.
Understanding these figures
Running costs and works: what is the difference?
Running costs are each year’s spending: wages, energy, upkeep, grants. Works create or renovate something that lasts: a school, a road, a sports hall.
How is the comparison with towns of the same size made?
The towns of 3,500 to 5,000 inhabitants are ranked from lowest to highest value; the median is the value in the middle. A value above or below the median is not a judgement: it depends on the area, the population and the powers held by the intercommunality.
Where do these figures come from?
From the town’s accounts kept by the public accountant (DGFiP), the local finance observatory (OFGL) and public procurement data. Qipu changes no amount.
Elected officials and staff of Plan-d'Orgon: to report a figure to correct or add context, write to Qipu.
Compare with Fontvieille or with another town:
Page published by Qipu, independent of the town · Sources and method
DGFiP balance-sheet accounts (nature axis) · OFGL (consolidated towns base) · Public procurement — DECP (data.gouv.fr) · National register of elected officials, archived versions 2020-2025 · 2025. The method · See the source