Skip to main content
Qipu

Public contracts of Pont-Sainte-Maxence · 2022

Extension et réhabilitation du groupe scolaire adrien bonnel - démolition désamiantage fondation dalle basse gros oeuvre parement pierre

The largest contract Pont-Sainte-Maxence awarded in 2022, out of 30.

Original label (DECP) : « Extension et réhabilitation du groupe scolaire adrien bonnel - démolition désamiantage fondation dalle basse gros oeuvre parement pierre » · Contract · Construction and Bâtiment · carried out in 60700

3.4€M
contract ceiling — what was paid on it is not published
Signed on 25 July 2022 · ended around March 2024 · 1.7 yrs
Ended25 Mar 2024

Who won it

Entreprise HainaultSIREN 323600635

The competition

Number of bids not published for that year: the field is only systematic from 2024.

Adapted procedure · awarded to 1 company

Open data publishes the winner and the bid count — never the identity of unsuccessful bidders.

View the consolidated DECP (data.gouv.fr) ↗

The form of the contract

PriceFerme et actualisable
Published amendmentsnone

The 4 lots

Lot 125 July 2022853k€
Lot 225 July 2022853k€
Lot 325 July 2022853k€
Lot 425 July 2022853k€

Other contracts of Entreprise Hainault in Pont-Sainte-Maxence

Extension et réhabilitation du groupe scolaire adrien bonnel - démolition désamiantage fondation dalle basse gros oeuvre parement pierre2025853k€

Marchés de plus de 40 000 € HT déclarés à la notification (DECP) : montants des contrats, pas les paiements. Les plus petits marchés ne sont pas publiés ; les montants manifestement erronés sont écartés.

Source: Public procurement — DECP (data.gouv.fr)·Data·Method
Extension et réhabilitation du groupe scolaire adrien bonnel -…: 3.4 M€, Pont-Sainte-Maxence 2022 · Qipu