Skip to main content

Public contracts of Pontchâteau · 2023 · Construction and buildings

Réhabilitation et extension du pôle solidaire

€178k
maximum contract amount over 18 months — what was paid on it is not published
Signed on 26 April 2023 · ended around October 2024 · 18 months

That is at most ~€119k a year on average: a maximum too.

Company selected

Guiheneuf et FilsTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Missillac (44780) · headcount 20 to 49 employees · SIREN 352043954

Number 3 by amount of the 20 contracts Pontchâteau published for 2023.

Other contracts of Guiheneuf et Fils in Pontchâteau

Construction de vestiaires sportifs, site du Landas2024 · maximum over 12 months557€kConstruction de vestiaires sportifs au Landas2024 · maximum over 12 months555€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : 4

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.