Skip to main content

Public contracts of Prayssac · 2023 · Other

Maîtrise d'œuvre

Réhabilitation et rénovation énergétique de la maison Santamaria et création d’une chaufferie bois granulés

€53k
maximum contract amount over 12 months — what was paid on it is not published
Signed on 18 September 2023 · ended around September 2024 · 12 months

Who won it

Sud EcowattIngénierie, études techniques · registered office Montauban (82000) · headcount 6 to 9 employees · SIREN 492784111

A contract awarded to a consortium of 3 holders; above, the main holder. With it: Selurl d'Architecture Vergely, MC2G. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 11 by amount of the 12 contracts Prayssac published for 2023.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.