Communauté de communes de la Région de Rambervillers · Vosges · Grand Est · 5,113 residents · Mayor: Claude Bourdon
Rambervillers
€9.7 million spent in 2025.
€1,889 per resident · Towns of the same size: €1,532
Rambervillers’s spending by policy area
Click a line to see what it pays for
The 4 other items (3%)
Source: the town’s 2025 accounts (DGFiP), by public policy.
Where the money goes
The €9.7M spent in 2025, by who receives it.
Source: the town’s 2025 accounts (DGFiP).
Contracts state a maximum amount for their whole term, often several years. That amount differs from what was paid. Purchases, services and works paid to companies by the town in 2025: €4.9M (its accounts).
Click a name to see its contracts
- Piantanida SA1 contract over 2 years · at most ~€413k a year on averageup to €826k
- Colas France1 contract over 2 years · at most ~€269k a year on averageup to €539k
- Adeco1 contract over 2 years · at most ~€76k a year on averageup to €153k
- Terideal Tarvel (Tarvel)1 contract over 5 months · at most ~€143k a year on averageup to €143k
- Verdi Ingenierie Est1 contract over 2.5 years · at most ~€42k a year on averageup to €94k
- Maddalon Freres1 contract over 2 years · at most ~€46k a year on averageup to €91k
- Les Metalliers Lorrains1 contract over 2 years · at most ~€43k a year on averageup to €86k
10 published contracts · €2.1M before tax
Why this total differs from the €4.9M of purchases, services and works paid to companies
These are the amounts of the contracts signed from 2024 to 2025, over their whole length, not what was paid in 2025. The money paid in 2025 also goes to purchases too small to be published (under €40,000 excl. VAT). For a framework agreement, the amount is a ceiling.
Investment and works
€3M of capital spending in 2025 (building, renovation, equipment), €588 per resident. Towns of the same size: €372.
Click a building site to see the contract
- Restauration de l’église Sainte-Libaire de Rambervillers : échafaudage, maçonnerie2024 · Culture, sport and youth · Piantanida SA€826k
- Aménagement de la RD159, avenue du 11 Novembre et route d’Épinal2024 · Streets and transport · Colas France (Établissement Vosges)€539k
- Restauration des façades, du porche et du clocher de l’église Sainte-Libaire : menuiserie2024 · Culture, sport and youth · Adeco€153k
- Travaux de restauration des façades, du porche et du clocher de l’Église Sainte Libaire de Rambervilllers…2024 · Maddalon Freres€91k
- Travaux de restauration des façades, du porche et du clocher de l’Église Sainte Libaire de Rambervilllers…2024 · Les Metalliers Lorrains€86k
Largest works contracted since 2023, among published contracts. Amounts planned at signature, often spread over several years.
In addition, €157k given to other bodies for their own equipment (joint funding, energy syndicate…).
Source: the town’s 2025 accounts (DGFiP), by public policy.
Revenue and financing
Revenue: €8.7M · spending: €9.7M.
Source: the town’s 2025 accounts (DGFiP).
Debt and taxation
Accounts 2025, main budget (excluding annex budgets such as water), except debt and savings: main and annex budgets together (OFGL consolidated accounts). Per resident: amount divided by the total population (Insee, in force in the year of the accounts). Sources: DGFiP, OFGL. “Towns of the same size”: median of the 1,216 towns of 5,000 to 10,000 inhabitants.
Who spends for the residents of Rambervillers
Spending per resident in 2025 of each public body the town belongs to, and what each one pays for.
- TownRambervillersPrimary schools, canteens, local streets, civil registry€1,889 per resident
- IntercommunalityCommunauté de communes de la Région de RambervillersWaste, water, urban transport, economic development€419 per resident
- DépartementVosgesMinimum income, elderly and disability care, middle schools, county roads€1,423 per resident
- RegionGrand EstHigh schools, regional trains, training, business support€743 per resident
Each amount is what the body spends per resident, from its accounts (DGFiP). Do not add them up: part of the money passes from one body to another.
Understanding these figures
Running costs and works: what is the difference?
Running costs are each year’s spending: wages, energy, upkeep, grants. Works create or renovate something that lasts: a school, a road, a sports hall.
How is the comparison with towns of the same size made?
The towns of 5,000 to 10,000 inhabitants are ranked from lowest to highest value; the median is the value in the middle. A value above or below the median is not a judgement: it depends on the area, the population and the powers held by the intercommunality.
Where do these figures come from?
From the town’s accounts kept by the public accountant (DGFiP), the local finance observatory (OFGL) and public procurement data. Qipu changes no amount.
Elected officials and staff of Rambervillers: to report a figure to correct or add context, write to Qipu.
Compare with Mirecourt or with another town:
Page published by Qipu, independent of the town · Sources and method
DGFiP balance-sheet accounts (nature axis) · OFGL (consolidated towns base) · Public procurement — DECP (data.gouv.fr) · National register of elected officials, archived versions 2020-2025 · 2025. The method · See the source