Skip to main content

Public contracts of Remire-Montjoly · 2022 · Construction and buildings

Extension de l’école Michel Dipp : construction du bloc administratif

€13k
maximum contract amount over 5 months — what was paid on it is not published
Signed on 2 May 2022 · ended around October 2022 · 5 months

Company selected

Bati TechTravaux d'installation électrique dans tous locaux · registered office Matoury (97351) · headcount 10 to 19 employees · SIREN 403313885

Number 44 by amount of the 45 contracts Remire-Montjoly published for 2022. It belongs to the policy Schools.

Other contracts of Bati Tech in Remire-Montjoly

Lot no5 : électricité cf2023 · maximum over 12 months59€kÉlectricité / climatisation / ventilation2022 · maximum over 16 months572€kConstruction du groupe scolaire Georges Othily de 18 classes…2022 · maximum over 16 months473€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.