Skip to main content

Public contracts of Revel · 2021 · Construction and buildings

Réhabilitation GSRS tr3-gros oeuvre

€120k
maximum contract amount over 9 months — what was paid on it is not published
Signed on 8 May 2021 · ended around February 2022 · 9 months

Company selected

SBR - Société de Bâtiment ReveloisTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Revel (31250) · headcount 6 to 9 employees · SIREN 351267208

Number 4 by amount of the 17 contracts Revel published for 2021.

Other contracts of SBR - Société de Bâtiment Revelois in Revel

Réhabilitation de l’église : charpente, couverture et zinguerie2025 · maximum over 13 months770€kRéhabilitation des vestiaires du terrain d’honneur du stade : gros…2023 · maximum over 10 months417€kRéhabilitation du groupe scolaire roger Sudre2019 · maximum over 10 months86€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : 2

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.