Supplier of Rive-de-Gier · Construction and buildings
TBS Building
TBS Building holds one public contract awarded by Rive-de-Gier in 2024. That is 4% of the value of the contracts the town awarded in 2024.
head office in Saint-Etienne (42) · Construction d'autres bâtiments · SIREN 879703239
€158k
at most, over the whole term of the contracts awarded by Rive-de-Gier in 2024
Its contracts in Rive-de-Gier
Maximum amount of each contract, over its whole term: not what was paid.
Réfection de toitures de bâtiments communaux2024 · maximum over 12 months · Simplified procedure€158k