Travaux de construction d’une cantine scolaire et extension du préau de l’école de Rochetoirin

€36k
maximum contract amount over 14 months — what was paid on it is not published
Signed on 10 February 2022 · ended around April 2023 · 14 months

That is at most ~€30k a year on average: a maximum too.

Company selected

RcbaTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office La Batie-Montgascon (38110) · headcount 10 to 19 employees · SIREN 828375527

Number 8 by amount of the 15 contracts Rochetoirin published for 2022.

Other contracts of Rcba in Rochetoirin

Travaux de construction d’une cantine scolaire…2022 · maximum over 14 months65€kTravaux de construction d’une cantine scolaire…2022 · maximum over 14 months65€kTravaux de construction d’une cantine scolaire…2022 · maximum over 14 months35€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : 2

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.