Supplier of Rognac · Construction and buildings
S.T.M.C. - Société Travaux Maconnerie Générale
S.T.M.C. - Société Travaux Maconnerie Générale holds one public contract awarded by Rognac in 2019. That is 4% of the value of the contracts the town awarded in 2019.
head office in Bouc-Bel-Air (13) · 20 to 49 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 487645103
€141k
at most, over the whole term of the contracts awarded by Rognac in 2019
Its contracts in Rognac
Maximum amount of each contract, over its whole term: not what was paid.
Réalisation d’une caserne de gendarmerie et d’un local CSU2019 · maximum over 15 months · at most ~€113k a year on average · Simplified procedure€141k