Skip to main content

Public contracts of Rognonas · 2020 · Construction and buildings

Construction d’un immeuble de 3 logements sociaux-2 route de la montagnette-13870 Rognonas

Enduits

€26k
maximum contract amount over 13 months — what was paid on it is not published
Signed on 25 November 2020 · ended around December 2021 · 13 months

That is at most ~€24k a year on average: a maximum too.

Company selected

Entreprise Pierre LaugierTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Jonquieres (84150) · headcount 20 to 49 employees · SIREN 340659622

Number 13 by amount of the 37 contracts Rognonas published for 2020. It belongs to the policy Streets and transport.

Other contracts of Entreprise Pierre Laugier in Rognonas

Travaux de construction d’un bâtiment mixte2023 · maximum over 11 months14€kRavalement des façades à l’école Mireille2021 · maximum over 1 month48€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.