Skip to main content

Public contracts of Romans-sur-Isère · 2019 · Construction and buildings

Réhabilitation de l’école de la Pierrotte

Phase 2-Romans-sur-Isère-10 lots

€39k
maximum contract amount over 3 months — what was paid on it is not published
Signed on 19 June 2019 · ended around September 2019 · 3 months

Company selected

Entreprise Ferlay et FilsTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Marches (26300) · headcount 6 to 9 employees · SIREN 343009106

Number 37 by amount of the 47 contracts Romans-sur-Isère published for 2019. It belongs to the policy Schools.

Other contracts of Entreprise Ferlay et Fils in Romans-sur-Isère

Reconstruction du stade bouliste Émile Gras2022 · maximum over 13 months528€kReconstruction du stade bouliste emile gras2022 · maximum over 12 months471€kConstruction d’un boulodrome couvert à Romans-sur-Isère2020 · maximum over 12 months201€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.