Travaux de rénovation de l’École Elémentaire de Sada 2

€86k
maximum contract amount over 3 months — what was paid on it is not published
Signed on 10 August 2021 · ended around November 2021 · 3 months

Company selected

SARL CuisibainsFabrication de charpentes et d'autres menuiseries · registered office Sada (97640) · SIREN 790662209

Number 10 by amount of the 16 contracts Sada published for 2021.

Other contracts of SARL Cuisibains in Sada

Urgence imperieuse cyclone Chido2026 · maximum over 1 month79€kUrgence impérieuse : cyclone Chido2024 · maximum over 1 month41€kRénovation de l’école élémentaire de Sada 4-Menuiseries2022 · maximum over 1 month237€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.