Skip to main content

Public contracts of Saint-Amand-Longpré · 2021 · Construction and buildings

Construction d’une nouvelle gendarmerie : gros œuvre

€441k
maximum contract amount over 16 months — what was paid on it is not published
Signed on 5 November 2021 · ended around March 2023 · 16 months

That is at most ~€331k a year on average: a maximum too.

Company selected

Maconnerie AmboisienneTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Nazelles-Negron (37530) · headcount 10 to 19 employees · SIREN 529094757

The largest of the 15 contracts Saint-Amand-Longpré published for 2021.

Other contracts of Maconnerie Amboisienne in Saint-Amand-Longpré

Travaux de réaménagement de la mairie2023 · maximum over 14 months134€kConstruction d’une nouvelle gendarmerie : gros œuvre2021 · maximum over 16 months439€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : 2

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.