Supplier of Saint-Broladre · Construction and buildings
SAS 2C Construction
SAS 2C Construction holds one public contract awarded by Saint-Broladre in 2025. That is 8% of the value of the contracts the town awarded in 2025.
head office in Saint-Malo (35) · 10 to 19 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 877604769
Its contracts in Saint-Broladre
Maximum amount of each contract, over its whole term: not what was paid.
Voirie et réseaux divers, gros œuvre2025 · maximum over 14 months · at most ~€46k a year on average · Simplified procedure€54kElsewhere in France
SAS 2C Construction holds contracts in 3 towns, worth €567k at award.