Public contracts of Saint-Cyr-sur-Mer · 2020 · Construction and buildings

Rénovation des mouillages et équipements portuaires

€480k
maximum contract amount over 4 years — what was paid on it is not published
Signed on 10 March 2020 · ended around January 2024 · 4 yrs

That is at most ~€125k a year on average: a maximum too.

Company selected

Mse Group (Marina System & Equipments)Construction d'ouvrages maritimes et fluviaux · registered office Signes (83870) · headcount 20 to 49 employees · SIREN 491933206

A contract awarded to 2 holders; above, the main holder. With it: Mse Travaux. The amount is the whole contract’s: the DECP does not publish each holder’s share.

The largest of the 11 contracts Saint-Cyr-sur-Mer published for 2020.

Other contracts of Mse Group (Marina System & Equipments) in Saint-Cyr-sur-Mer

Remplacement de la Panne 6 port de la madrague2023 · maximum over 3 months84€kMise en oeuvre du balisage maritime durant la saison balnéaire2021 · maximum over 1 month54€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.