Skip to main content

Public contracts of Saint-Félix · 2023 · Construction and buildings

Extension GRPE scolaire cloisons doublage

€61k
maximum contract amount over 15 months — what was paid on it is not published
Signed on 3 January 2023 · ended around April 2024 · 15 months

That is at most ~€49k a year on average: a maximum too.

Company selected

Albert et RattinTravaux de menuiserie métallique et serrurerie · registered office Saint-Baldoph (73190) · headcount 20 to 49 employees · SIREN 418892063

A contract awarded to 2 holders; above, the main holder. With it: Alb'Enseignes. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 10 by amount of the 11 contracts Saint-Félix published for 2023.

Other contracts of Albert et Rattin in Saint-Félix

Rénovation et extension salle des fêtes2024 · maximum over 16 months271€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : 3

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.