Public contracts of Saint-Félix · 2022 · Construction and buildings

Maîtrise d’œuvre pour la rénovation et l’extension de la salle des fêtes

€220k
maximum contract amount over 2 years — what was paid on it is not published
Signed on 5 December 2022 · ended around December 2024 · 2 yrs

That is at most ~€110k a year on average: a maximum too.

Company selected

Cabinet d'Études Techniques pour le Bâtiment et l'IndustrieIngénierie, études techniques · registered office Annecy (74600) · headcount 6 to 9 employees · SIREN 344162912

A contract awarded to a consortium of 5 holders; above, the main holder. With it: Bureau d'Études Plantier, Rez'On, Le Guilcher. The amount is the whole contract’s: the DECP does not publish each holder’s share.

The largest of the 2 contracts Saint-Félix published for 2022.

Other contracts of Cabinet d'Études Techniques pour le Bâtiment et l'Industrie in Saint-Félix

Aménagement médiathèque locaux ancienne école maternelle2024 · maximum over 20 months105€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 1

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.