Supplier of Saint-Fiacre-sur-Maine · Construction and buildings
Jonchere
Jonchere holds one public contract awarded by Saint-Fiacre-sur-Maine in 2026. That is 13% of the value of the contracts the town awarded in 2026.
head office in Saint-Hilaire-De-Clisson (44) · 10 to 19 employees · Fabrication de structures métalliques et de parties de structures · SIREN 434646980
What Jonchere does in Saint-Fiacre-sur-Maine
Maximum amount of each contract, over its whole term: not what was paid.
Métallerie-serrurerie2026 · maximum over 3 years · at most ~€16k a year on average · Simplified procedure€49k