Public contracts of Saint-Genest-Lerpt · 2023 · Construction and buildings

Construction d’une tribune et d’un boulodrome : couverture, étanchéité

€340k
maximum contract amount over 14 months — what was paid on it is not published
Signed on 19 October 2023 · ended around December 2024 · 14 months

That is at most ~€291k a year on average: a maximum too.

Company selected

Super PlomberieTravaux d'installation d'eau et de gaz en tous locaux · registered office Saint Genest Lerpt (42530) · headcount 10 to 19 employees · SIREN 754094464

A contract awarded to 3 holders; above, the main holder. With it: Super (Allo Forez Couverture Zinguerie), Super Etancheite. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 7 by amount of the 32 contracts Saint-Genest-Lerpt published for 2023.

Other contracts of Super Plomberie in Saint-Genest-Lerpt

Travaux de requalification des préaux, espaces extérieurs de l’école…2024 · maximum over 6 months141€kTravaux de requalification des préaux, espaces extérieurs de l’école…2024 · maximum over 6 months49€kTravaux de rénovation et d’extension de l’espace culturel pinatel2023 · maximum over 15 months46€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 5

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.