Supplier of Saint-Georges-Haute-Ville · Construction and buildings
SARL Faure Christophe Maconnerie
SARL Faure Christophe Maconnerie holds 2 public contracts awarded by Saint-Georges-Haute-Ville in 2024. That is 9% of the value of the contracts the town awarded in 2024.
head office in Saint-Georges-Haute-Ville (42) · 10 to 19 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 316054865
Its contracts in Saint-Georges-Haute-Ville
Maximum amount of each contract, over its whole term: not what was paid.
Centre bourg : logements et commerces2024 · maximum over 20 months · at most ~€113k a year on average · Simplified procedure€189kCentre bourg : commerces2024 · maximum over 20 months · at most ~€104k a year on average · Simplified procedure€174kElsewhere in France
SARL Faure Christophe Maconnerie holds contracts in 2 towns, worth €393k at award.